Connect cooked into gas main


  • Gas Work
  • Aylesbury
  • Posted 5th May 2017

Connect outside gas pipework into kitchen into gas cooker line. Three feet of pipework and drilling through outside wall required for connection. Ground floor with good easy access. All pipework exposed.
Positive Review for Chris Build on 16th May 2017
More than satisfied with the quick and efficient response and the quality of the work. Good value. I would recommend to my friends.