Replastering and tiling


  • Bathroom fitting
  • Bethnal Green
  • Posted 30th Nov 2009

A shower was added to a bath without tiling around the splash areas. This needs to be taken out and redone properly.

The work includes:
* unplumb shower
* remove tiles, bath seal, shelves
* replaster circa 2 square metres
* retile circa 7 square metres
* insert mirror
* put up new shelves (glass or ceramic)
* replace shower

It would be particularly convenient to do this in the 2nd or 3rd week of December, but it could happen in February.

We can contract for removal of the shower separately if you do not have a relevant certificate.

Whether we supply the tiles and shelving, or you do, is negotiable.

Thanks,

Ian