Bathroom fitting, plumbing and tiling


  • Bathroom fitting
  • Norbury
  • Posted 17th Aug 2012

1. the cast iron soil pipe must be replaced with the plastic pipe. the soil pipe location should remain at its original place. 2. the new toilet must be installed in the right hand further corner of the bathroom. 3. the bathtub should be installed in the right corner of the bathroom 4. the shower screen must be mounted 5. the shower must be mounted to the ceiling, connecting pipes must run through the roof 6. the wall with the shower mixer must be covered with waterproof boards 7. the 2 walls adjacent to the bathtub must be tiled from the bathtub level 8. the sink counter-top mus be installed and the sink must be mounted on the counter-top 9. Kitchen sink and washing machine should be plumbed 10. External tap must be installed for watering the garden The client ( myself) will supply the bathroom suite (bathtub, toilet, sink), bathtub and sink taps, shower head and shower mixer, tiles, tiles adhesive, sink counter-top, additional floorboards.
Positive Review for Wito Design And Build Ltd on 30th Sep 2012
Vito and Ivan visited the site and gave invaluable advice on how to best carry on certain tasks. Vito, who is an expert on decoration, repaired cracks in the walls and ceilings, advised on and provided the most suitable filler and paint. Ivan, who is skilled in carpentry, fitted the kitchen and repaired floorboards in the house. They always arrived with their own equipment and materials. The entire work was carried to high standard and without fuss. I would strongly recommend this team.