internal/external renovations


  • Refurbishments
  • Bristol
  • Posted 20th May 2013

rad in master bedroom moved to central wall, rad put into small bed room, wc fitted inbathroom tiling completed grouting in same coulor as tiles,plus floo covering, switch moved, at top of stairs,mirrow fixing to wall at top of stairs some sort of cover over wires down the stairs, window fitted in kitch, intragal kitchento be fitted and tiled, wood burner to be bought and fitted, chimney pot to be fited,rad in sitting room to be connected, dunlope underlay to be layed carpeted through out ,80% wool carpet to be fitted through out, double garage to be biult, bay window to be installed painting and elctrics where nessary