small works in loft conversion required for completion cert


  • General building
  • Romford
  • Posted 20th Aug 2013

1. Extend landing at top of stairs, needs small partition, then door/frame to be built again.
2. Shower room requires extractor fan.
3. Front roof slope requires roof void ventilation.
4. 2nd fl waste requires rodding access & proper support.
5. Access door to boiler needs to be insulated.
Neutral Review for Bp Bespoke Refurbishment on 27th Aug 2013
installed extractor fan in bathroom,fitted vents in sloping roof, built partition and refitted door & frame,extended waste pipe for sink and fitted rollers for shower door in 3 days. I would have given a (4 - Good) but unfortunately the finish on the woodwork was not a very good standard. Shame, other than that pleased with the rest of work.