We need to replace the bathroom and the en suite in our flat. We plan to replace all parts directly, so do not intend to move plumbing unless necessary. Bathroom consists of shower-bath, toilet, sink and radiator. En suite consists of toilet, sink and radiator (there is a shower but that does not need replacing). There is also the option to do the tiling, flooring and painting in both rooms if you like. We have no timing restrictions but would like it done as soon as possible. The current suites were installed when the flats were built 20 years ago.
Melvin and Ian did a great job on our bathrooms. The quote Melvin gave was accurate and detailed. They worked hard to make sure the finish and details were excellent, and were happy to deal with any changes we made. They made a real effort to limit the mess generated by the work each day and tidied everything up at the end of the day. I would happily employ Melvin to do more work for us.