Remove parquet flooring and lay enginered flooring 9sqm


  • Flooring
  • Croydon
  • Posted 28th May 2020

Roughly 9sqm of parquet flooring needs to be removed and underlay put down before engineered wood is put down and tile around fire place
Positive Review for Lilys Maintenance on 21st Jun 2020
The work was done to a good standard, Unfortunatly Fred wasn't able to do the work but his dad lifted 14sqm of parquet flooring and layed some engineered wood flooring. the work was done quickly and he was really accomodating to working around 3 very small children!