timber replacement and damp proofing
- Damp proofing
- Birmingham
- Posted 24th Feb 2012
low level damp ingress, new chemical damp proof course where indicated in report.
whole suspended timber floor in middle room above basement removed and replaced.
No insecticide treatment is required as all infested timbers are to be removed. The high external ground level must be lowered to a minimum of 150mm below the damp proof course.