Is building regs approval required before removing a chimney breast from the 1st floor of a semi-detached house? Your help is appreciated :-)
You will need to contact you local council as you are going to work on the structure of the house.
Not unless you are in a conservation area or a listed building
Yes you need building regs approval before removing.
If you like to remove a chimney breast you not required approval for it from building regs
Yes due to structual issues and ajoining property drawings or building method to show future structual finish and support
Yes because you will need to involve a structural engineer who will calculate loadings and design apropriate support system ie steel beams/columns
Davie
No there is no building regs approval needed for that
A structural enginers report will be required as well as building regs approval .you will properly need a party wall agreement as well
Yes, as you need to adequately support the remaining stack above and/or below.
Building regs always depend on the council for that area , all councils are different and have there own set rules/regs basics are the same but it really can vary . Contact your local council before any major works are undertaken hope this helps
B&D Plastering
You will need to get a Structural Engineers report and advise Building Regs
Yes you will need building reg. You will also need a structural engineer if you havnt removed the chimney from the roof down as a steel will be required.