How long I need to wait before being able to apply a mist coat to fresh plaster please?
Till the plaster is properly dried it is all depends on temperature
Need to wait until the plaster is completely dry between 3/7 days
Please allow a minimum of 3 days before applying paint to fresh plaster, in colder areas the drying time could be longer
Depends what paint you are using if you are using a contract matt you can go on when not fully dry as it will let the moisture dry throughout if you using any other paint let it dry completely
sdfds
3 Reviews, 33% Positive
Always dependent on temperature. We would say from after 4 days.
Depending on the plaster you should wait 7 day or fully dry and your plasterer should explain the colour changes till dry