We are in the process of thinking about / gathering ideas for a potential loft conversion. Obviously I realise that there are a lot of factors that cause the length of time to vary, but on average how long does a loft conversion (2 bedrooms & 1 wetroom) take?
Depends on size of job and any special requirements. For a loft in a semi with good access and no ensuite etc about 3-4 weeks
Between 6 weeks and 3 months dipends on size and design.
A loft converstion on average can take 6-8 weeks depending upon alot of factors, planning approved, party wall agreement in place and signed.
Problems found to the building whilst carrying out works.
Depending on many factors to time scale.
Skylight dormers with staircase and bedroom normally take 15 to 20 days.
Full dormer could take 6 to 8 weeks depending on internal finish wanted.
It could be one side of gable wall may need extending at the apex.
hi if you allow 4-6 weeks this should this should be ample time to complete inc dormer if no dormer 3 weeks.Have you considered using tele beams worth a google we have done a few lofts with these although a bit pricey they do sped the job up
We need planning permission.
Structural engineer details
Party wall agreement if necessary
Time for loft convention 9-12 weeks
Hi, roughly 6-12 weeks. This is very vague and of course depends on things like specific project requirements, party wall agreements, building control, etc, etc
Damian
its all depends of the project itself, if is occupied it will take longer, average time for loft conversion is 6weeks
We can complete a standard loft conversion(2 bedrooms & 1 wetroom) in as quickly as 4 weeks and this may vary with the size and may complete in 6 weeks.We value the time of our clients and aim to minimise the disruption to family life this means most of the project materials and procurement are planned for in advance to minimise lead times.
Hello,
an average loft conversion will normally take 5-6 weeks however the size of the dormer and interior work can vary and see it go considerably over the time in question. To be exact we would have to come and measure the loft etc to give a accurate estimation.
Kind regards
Top Lofts UK
avarage time would be 4/6 weeks
5-6 weeks the builder will need to finish a loft conversion(off course the size is a factor to ).
Hi rouglhy should be 8-10 weeks. Depend on finish standard inside I mean just painting or extra bespoke furnitures etc
Mc London Builders
lotf conversion 2 bedrooms and wetroom in average take 3-4 month
as you stated it dependes on how much detail is going in to the finish but an avrage loft converstion can take up to 8 weeks but most 6 weeks
on average 8-10 weeks incl. plannings etc..
6 weeks although it can often be completed in 3 weeks
A lot of varying factors like access, existing single storey or higher but allow 10 weeks if access etc not too onerous.
Hey! Regarding your question check out the photos on my profile, Iv just completed a loft conversion. depending on the size it shouldn't take that long if your living in a average sided house. I done one in a stately home in cowbridge and that took 12 weeks, and there was no access to it before we started!
Once the attic is cleared you can start framing the frame of the roof in no time, then it's down the the insulation, boarding and skimming before adding the finishing touches like your wet room ect :)
Loft conversion could take up to 12 weeks depending on size of propertys an if the degree of the roof has to be changed for dormers ect
Average time wuith 4 people it will take around 2 months to complete finish !
An average loft conversion would take between 5 and 6 weeks complete
Hi
This should take NO longer than 4 weeks from start to finish including decorating
Regards simon
You be looking around 2 or 3 weeks were out teams work u days a week 6 to 5
Loft conversion 8-11weeks
Hi, We complete a hip to gable loft conversion on a common semi detatched house in around 6 - 8 weeks. A terraced dormer conversion in around 5 - 7 weeks. This can vary if it is a larger property.
Something of this size would take anything between 8 and 16 weeks all depending on the the company you get to carry out the works. Life lofts would have it complete within 8 weeks
loft conversion is between 10 to 12 weeks