Phase Electrical Systems Ltd

Location: Newport, Monmouthshire
Member Since: 20th Jun 2012

About Us:

Phase Electrical Systems Ltd.
We undertake all of the following works
*Rewires
*Electrical Installation Condition Reports (EICR's)
*Security Alarms
*Smoke detection systems for all types of dwellings.
*Electrical upgrades.
*C.C.T.V.
*Access Control/Intercoms
*Emergency Lighting systems.
*High level lighting specialist.
ALL DOMESTIC, COMMERCIAL & INDUSTRIAL INSTALLATIONS UNDERTAKEN AND COMPLETED TO A HIGH STANDARD AT A REASONABLE COST.

History:

Phase Electrical Systems Ltd started off doing small jobs for local people and friends and we have now built up a business which now provide services to large national businesses across the United Kindom.
We still value our routes and enjoy helping out our locals when they require our services.

Other:

I carried out my apprenticship with our local authority and gained City & Guilds certificates at the end of my apprenticship.
Moving with the times I successfully completed multiple exams and tests as regulations changed in order to keep up the qualifications to comply with NICEIC rules.
We are fully registered NICEIC Approved Contractors, NICEIC Domestic Installers and NICEIC Portable Appliance Testers.

Feedback:

0 reviews

Answers:

Any new wiring or additional points installed to any property should be accompanied by a relevant niceic certificate (minor works or installation certificate). for the certificates to be issued the circuit/s that have been altered or added will need to comply with the regulations stated in the current edition of bs7671. so the following will have to be in place to insure safety.
- main earthing conductor.
- main bonding conductors to water, gas or oil services.
- distribution board must be able to provide the following:
1. rcd protection to the circuit altered or added,
2. have no signs of thermal damage.
3. not be damaged in anyway.
4. have a suitable spare way for any additional circuit added.
5. mcb's should be of the same make as the distribution board so that they fitting securely to the - if a circuit is altered or added to it should pass the inspection and testing process required.
An electrical installation condition report (eicr) should cost around £130.00 for an average 3 bedroom house. this will include 3-4 hours on site undertaking the inspection and testing, then 1-3 hours compiling the certificate and recording any defects or non-compliances found and issuing an niceic approved contractors certificate
Answer is yes.
there are pull switches with indicator lights available by most brands. "mk" might be a little more expensive at around £15.00 but other makes like "click" retail for around £5.00.
Simple answer is to replace the shower pull switch as they cannot be repaired.
general wear and tear is the main cause of the pull switch becoming defective and non-operational. i recommend the purchasing and fitting of a good quality pull switch in order to gain long, safe and reliable operation of your isolation switch.
Although costings may differ slightly due to areas, in our area distribution boards are replaced for around £450.00-£600.00 including niceic certification being issued.

Would you like a quote from this tradesman?

Invite this tradesman to quote for your job & get a fast response.
  • Other tradesmen may express their interest as well.
Get in touch with this tradesman