we have a small hall, roughly 10'8 x 7'10, at the front door the concrete has sunk so will need filled in and the rest of the space levelled. the rest of the ground floor has recently been ashphalted which was a very economical option but we are open to other equally economical options.
Fantastic work that was professionally finished and competitively priced. Really efficient and tidy throughout the job. Thanks so much!