complete fitting with new walk in shower


  • Bathroom fitting
  • Newport
  • Posted 4th Sep 2017

CHANGE PLUMBING CONFIGURATION
TILE FLOOR AND WALLS
ELECTRIC LIGHT AND HEATING
WALK IN SHOWER TO BE FITTED (REMOVE BATH)
SIZE TWO AND HALF MTR X TWO MTR
ASAP
Negative Review for Mmt on 12th Nov 2017
After 5 weeks of waiting since the "finish" of the job our bathroom is still unfinished. Tall cupboard still not provided, although paid for, small cupboard to hide large WC pipe still not fitted, tiles at the end of the shower are losing their grouting, tiling around window very poor, two caps on shower fitting missing and the pipe under the basin was leaking (now sorted by my partner, as was the poor grouting.) Got what we paid for - cheap job!