Dry-liner required to help us close off a renovation project
- Plastering
- Blackpool
- Posted 3rd May 2025
We doing a refurbishment of x3 flats as part of a property conversion. We are currently at the framing and boarding stage with 2 of the flats and need additional help to move things along with the 3rd flat. Works:
- Installation of MF ceiling (approx. 70sqm)
- Drying/Boarding a) Ceiling and stud walls, and b) Brick walls (dot n dab) (approx. 200sqm in total)
- NOTE1: Tape and joint only, sanded and ready for painting
- NOTE2: Joiner also required: stud walls, flooring and kitchens
- NOTE3: Labour only, materials supplied
To make things easier, please quote in “price per sqm” for MF and boarding. That way if we need you to do additional work e.g. the basement storage rooms, it can be easily costed with minimal fuss and full transparency.