History:
We are a small construction firm .
With a very high standard of workmanship .
Al aspects of
Extensions.loft conversions.bathrooms.kitchens.bedrooms.
Joinery.plumbing.tiling.electrical works.brickwork.ground work .plastering
Answers:
. tiling metro tiles around a window does take time ..
. a standard bathrolm fully metro tiled should take between 5 to 6 days
. always get a price to do the total job .not a day rate
. adhesives . thdebetter option is powdered adhesives .. better grab and better setting qualities
Labour only would be apprx £70:00 per square metre to bould a brick wall
If you have a combi boiler .
you should be perfectly fine to use a bar valve .
you wi have good preasure coming from the boiler to the valve .
No ..
remove all wall tiles
plaster walls
allow 2 weeks to dry
prime new plaster
then wall paper
Instal a combi boiler to provide the supply to the new underfloor heating